TEEPSA

Block 5/6/7:

Block 11B/12B:

Green Connection and Natural Justice Court Case Against TEEPSA 567
19/03/2024

LSA 231067 Appeal Decision-
/09/2023

Appeal_TEEPSA 567_GC and NJ -
/04/2023

TEEPSA-567-The-Green-Connection-Natural-Justice-Appeal
/04/2023

TEEPSA 567 ESIA LETTER Decision Notification - AFRIKAANS
20/04/2023

WILDTRUST TEEPSA 11B/12B Comments
14/11/2023

Comments on TEEPSA production right ESIA
14/11/2023

TEEPSA 11B/12B Draft EIA Expert Climate
14/11/2023

TEEPSA 567 ESIA LETTER Decision Notification - ISIXHOSA
20/04/2023

TEEPSA 567 ESIA LETTER Decision Notification- ENGLISH
20/04/2023

TEEPSA Block 567 EIA The Green Connection Comments on Draft EIR
07/10/2022

Comments on TEEPSA Production Right Draft Scoping Report
03/02/2023

Consultation Notice
05/09/2022

The Green Connection Comments On TEEPSA Block 5/6/7 - Draft Scoping Report
04/07/2022

TEEPSA-567-ESIA-Stakeholder-DSR-Letter-220520-Rev4-AFRIKAANS-GENERAL.pdf
20/05/2022

TEEPSA 567 ESIA Stakeholder DSR Letter 220520_Rev4 ENGLISH GENERAL
20/05/2022

TEEPSA-567-ESIA-Stakeholder-DSR-Letter-220520_Rev4- ISIXHOSA-GENERAL.pdf
20/05/2022

Block 11B 12B TEPSA - Green Connection Comments on Draft Scoping Report
21/10/2020

Block 11B 12B TEPSA - Green Connection Comments on Draft Scoping Report
21/08/2020

1 - Block 11B 12 B TEPSA TGC Comments on Draft Scoping Report
20/08/2020

Total E&P South Africa B.V - Notification of Withdrawal of Application
03/04/2021.

Letter To Total - President Macron
08/02/2023

TOSACO

Deep Western Orange Basin (DWOB) :

CGG Seismic Surveys

WILDTRUST TEEPSA 11B/12B Comments
14/11/2023