Comments on the Draft Scoping Report for the Proposed Explorattion Well Drilling in Block DWOB- Ref 12-3-343 ER 19/02/2025
Green Connection letter on environmental baseline study conducted by TEEPSA (DWOB and 3B4B) 27/01/2025
Notice to Oppose Total Energies 07/11/2024
DWOB Court Challenge FA /10/2024
Appeal template Sezygin DWOB 15/11/2023
Cover letter DWOB Appeal 15/11/2023
Annex B1 Wild Trust TEEPSA DWOB 15/11/2023
Annex E Appeal Template TEEPSA DWOB 15/11/2023
Annex A DWOB Notification 15/11/2023
Annex B Appeal TEEPSA DWOB 15/11/2023
The Green Connection Comments On TEEPSA DWOB - Draft Scoping Report 14/12/2022